Power System

Power System


Power System

Project Description

LOTECO has invested in 02 new lines, bringing the total number of power supply lines for Loteco from 110/22kV station to 8 lines operating in parallel, besides Loteco also had 02 more 22kV lines from outside the industrial park as backup source; upgraded 02 110/22kV transformers with capacity from 2×40 MVA to 2×63 MVA to supply power to 49 customers with an average capacity of 42 MW with an average power output of 160 million kWh/year. Loteco has 2 generators with a capacity of 2.36 MW ready to support power supply in case of power shortage, breakdown, etc. of EVN

Parallelly with the investment and expansion of the power grid, the company also pays great attention to the stability and quality of electricity. In 1 year, the company has 3 days of maintenance, testing and replacement of degraded equipment on holidays of the year. Therefore, the power failure in LOTECO IP is much lower than in other IPs and the blackout time is very short. Power outages occur due to EVN’s power source and customer’s equipment failure.

The round-linked grid system ensures stable and continuous power supply to customers in the IP. LOTECO operates, maintains and repairs the 22/0.4 kV medium voltage power system to provide power, support, troubleshoot, and advise on issues related to electricity for customers in the industrial park 24/7